Newark & Sherwood Plan Review - Publication Amended Core Strategy
Appendix D Public Transport and Highway Infrastructure Requirements
Public Transport and Highway Infrastructure Required for Delivery of the Newark and Sherwood Core Strategy
Location |
Improvement |
Timescales |
Cost |
Funding (F) / Delivery (D) Responsibility |
Public Transport Schemes |
||||
District Wide |
Smarter Choices e.g. Travel Plans etc. |
Consistent with Development |
TA |
Developer (F) / NCC- LTP (F) Sustrans (F&D) |
District Wide |
On / Off site cycling / walking infrastructure |
Consistent with Development |
TA |
Developer (F), NCC-LTP (F&D) |
District Wide |
Bus network / infrastructure improvements |
Consistent with Development |
TA |
Section 106 -Developer (F) |
Highway Junctions Outside of Newark Urban Area |
||||
A1 Overbridge widening, Fernwood, Newark |
Widening of the A1 Overbridge |
Consistent with development |
£5,200,000 |
CIL/Other Public Contribution (F) NCC (D) |
A46 Link Capacity, Newark-on-Trent Bypass |
Carriageway Dualling |
Post 2020 |
£600,000 |
DFT, RIS 2 Funding (F) Highways England (D) |
A46/A617 Cattle Market Roundabout, Newark-on-Trent Bypass |
Grade Separated Junctions |
Post 2020 |
£3,600,000 |
DFT, RIS 2 Funding (F) Highways England (D) |
A1/A17/A46 Winthorpe (Friendly Farmer) Roundabout, Newark on Trent Bypass |
Grade Separated Junctions |
Post 2020 |
£2,400,000 |
DFT, RIS 2 Funding (F) Highways England (D) |
A1/A46 Brownhills Roundabout, Newark on Trent Bypass; |
Grade Separated Junctions |
Post 2020 |
£2,400,000 |
DFT, RIS 2 Funding (F) Highways England (D) |
Land East of Newark |
Local Transport Infrastructure Improvements (to be defined following detailed analysis) |
Consistent with Development |
To be defined following detailed analysis as part of planning application |
Section 106 – Developer (F) Developer (D) |
Land South of Newark |
Local Transport Infrastructure |
2021 |
Circa £50,000,000 |
Section 106 –Developer Government, LEP NSDC (F) Developer (D) |
Land around Fernwood |
Local Transport Infrastructure Improvements |
Consistent with Development |
£4,700,000 |
Section 106 – Developer (F) Developer (D) |
A46(T)/A113 Drove Lane (A46 Winthorpe Roundabout) Winthorpe |
Grade Separated Junctions |
Post 2020 |
£3,600,000 |
DFT, RIS 2 Funding (F) Highways England (D) |
Kelham Bypass, Kelham |
New Bridge over the River Trent and a Bypass to the Village |
Consistent with Development |
£15,000,000 |
33% CIL, 67% D2N2 LEP (F) NCC (D) |
A6097/A612 Junction at Lowdham |
Junction improvements and Signal Control |
Consistent with Development |
£1,500,000 |
CIL/Other Public Contribution (F) NCC (D) |
A614/C1 Junction - 'White Post' Roundabout, Farnsfield |
Junction Improvements |
Consistent with Development |
£600,000 |
CIL/Other Public Contribution (F) NCC (D) |
A614/Mickledale Lane Junction, Eakring |
Junction Improvements |
Consistent with Development |
£300,000 |
CIL/Other Public Contribution (F) NCC (D) |
A614/A6097 Junction, Oxton |
Junction Improvements |
Consistent with development |
£1,500,000 |
CIL/Other Public Contribution (F) NCC (D) |
A614/C13 Eakring Road Junction |
Speed Reduction Measures |
Consistent with Development |
£120,000 |
CIL/Other Public Contribution (F) NCC (D) |
A614/A6075/A616 Ollerton Roundabout junction |
Roundabout Improvement |
Consistent with Development |
£5,000,000 |
Section 106/Other Public Contribution (F) NCC (D) |
Junctions Within Newark Urban Area |
||||
London Road/ Portland Street, Newark |
Signal Control |
Consistent with development |
£60,000 |
CIL /Other Public Contribution (F) NCC (D) |
Barnby Gate / Sherwood Avenue Junction Newark |
Signal Control |
Consistent with Development |
£60,000 |
CIL/Other Public Contribution (F) NCC (D) |
Lincoln Road/ Brunel Drive Junction, Newark |
Junction Improvements |
Consistent with Development |
£300,000 |
CIL/Other Public Contribution (F) NCC (D) |
Lincoln Road/ Northern Road Junction, Newark |
Signal Control |
Consistent with Development |
£240,000 |
CIL/Other Public Contribution (F) NCC (D) |
Castle Gate / Lombard Street Junction, Newark |
Junction Improvements |
Consistent with Development |
£300,000 |
CIL/Other Public Contribution (F) NCC (D) |
Beacon Hill Road/ Northern Road Junction, Newark |
Signal Control |
Consistent with Development |
£144,000 |
CIL/Other Public Contribution (F) NCC (D) |
Sleaford Road/ Friary Road Junction, Newark |
Junction Improvements |
Consistent with Development |
£300,000 |
CIL/Other Public Contribution (F) NCC (D) |
Queens Road/ North Gate Junction, Newark |
Junction Improvements |
Consistent with Development |
£240,000 |
CIL/Other Public Contribution (F) NCC (D) |
Northern Road/Brunel Drive Junction, Newark |
Signal Control |
Consistent with Development |
£500,000 |
CIL/Other Public Contribution (F) NCC (D) |
Infrastructure Required for Delivery of the Newark and Sherwood Core Strategy- Newark, Balderton and Fernwood |
||||
Infrastructure Area |
Infrastructure Detail |
Trigger |
Cost |
Funding (F) / Delivery (D) Responsibility |
Education |
Provision of 813 Primary School Places (Equivalent to 2 x 2FE) |
Consistent with Development |
£9,312,915 |
Section 106 –Developer (F) NCC (D) |
Provision of 1,499 Secondary School Places |
Consistent with Development |
£25,872,740 |
DfE/EFA (F) NCC (D) |
|
GP Practices/Health Facilities |
New/expanded GP Practices |
Consistent with Development |
£7,904,000 |
Section 106 –Developer (F) NHS/NSCCG (D) |
Leisure |
Newark Sport and Community Village |
Consistent with Development |
NSDC, Section 106 -Developer Contributions (F) YMCA (D) |
|
Southwell |
||||
Education |
88 New Secondary School Places |
Consistent with Development |
£1,518,880 |
CIL (F) NCC (D) |
Ollerton & Boughton |
||||
Education |
Provision of 196 Primary School Places (New 1FE Primary School is likely to be required) |
Consistent with Development |
£2,245,180 |
S106 Developer (F) NCC (D) |
444 New Secondary School Places |
Consistent with Development |
£7,663,440 |
CIL (F) NCC (D) |
|
GP Practices/Health Facilities |
New/Expand GP Practices |
Consistent with development |
£888,250 |
Section 106 –Developer (F) NHS NSCCG (D) |
Edwinstowe |
||||
Education |
Provision of 155 Primary School Places (New 1.SFE is likely to be required between Clipstone and Edwinstowe) |
Consistent with Development |
£1,775,525 |
S106 Developer (F) NCC (D) |
Clipstone |
||||
Education |
Provision of 168 Primary School Places (New 1.SFW Primary School is likely to be required between Clipstone and Edwinstowe) |
Consistent with Development |
£1,924,440 |
S106 Developer (F) NCC (D) |
GP Practices/Health Facilities |
Expand GP Practices |
Consistent with Development |
£760,000 |
Section 106 Developer (F) NHS NSCCG (D) |
Rainworth |
||||
Education |
84 New Secondary School Places |
Consistent with Development |
£1,449,840 |
CIL (F) NCC (D) |
District Wide
|
||||
Leisure |
Libraries – Provision of Additional Library Stock |
Consistent with Development |
£621,379 |
Section 106-Developer (F) NCC (D) |
Landfill |
3.6 million cubic metres non-hazardous landfill capacity required within the County to meet future demands that the District will contribute towards |
By 2022/23 |
N/A |
NCC (F) NCC (D) |
Energy from Waste |
200,000 tonnes of extra EfW capacity is required within the County to meet future Commercial and Industrial needs that the District will contribute towards |
By 2033 |
N/A |
NCC (F) NCC (D) |
Municipal Recycling and Composting |
182,000 tonnes per annum extra recycling and composting capacity required within the County to meet future demands that the District will contribute towards |
By 2033 |
N/A |
|
Water Supply |
Water company charges for: connecting to the existing networks, requisitioning new assets and contributing to wider network reinforcement (where required) |
Consistent with development |
N/A |
Developer (F) Severn Trent Water/Anglian Water (D) |
Gas |
Local land connections to strategic infrastructure |
Consistent with development |
N/A |
Developer (F) National Gas Grid (D) |
Electricity |
Local land connections to strategic infrastructure |
Consistent with development |
N/A |
Developer (F) National Grid (D) |
Tele-communications |
FTPI for all developments of 100+ dwellings |
Consistent with development |
N/A |
BT Open Reach (D) |
Waste Water |
Water company charges for: connecting to the existing networks, requisitioning new assets and contributing to wider network reinforcement (where required) |
Consistent with development |
N/A |
Developer (F) Severn Trent Water/Anglian Water (D) |
Flood Defences |
Local measures to reduce the causes and impacts of flooding. Identified and delivered as part of individual developments. |
Consistent with development |
N/A |
Developer (F) Developer (D) |
Green Infrastructure |
Green infrastructure to be provided by developments in areas with shortfalls and negative change sin provision as a result of planned growth. Costs to be identified at planning application stage and new Green Infrastructure delivered and funded by developers as an integral part of developments |
Consistent with development |
N/A |
Developer (F) Developer (D) |
Other Locations |
||||
Education |
Provision of 188 Primary School Places across the District |
Consistent with Development |
£2,153,540 |
Section 106 – Developer (F) NCC (D) |
41 New Secondary School Places |
Consistent with Development |
£707,660 |
CIL (F) NCC (D) |
|
GP Practices/Health Facilities |
Expand GP Practices across the District |
Consistent with Development |
£1,729,000 |
S106 –Developer (F) NHS NSCCG (D) |